Step 1
Place the bolt down base on the ground where it is to be installed (minimum 100mm concrete slab). Mark where the four (4) holes are to be drilled. You can either remove the base or keep it in position and drill the holes according to the marks.

![bolt-down-step-1-1920_1280[1] Revolvashade install bolt down base](https://revolvashade.com/wp-content/uploads/2023/05/bolt-down-step-1-1920_12801-150x150.jpg)
![bolt-down-step-2-1920_1280[1] Screw bolt-down base into position with dyno bolts](https://revolvashade.com/wp-content/uploads/2023/05/bolt-down-step-2-1920_12801-150x150.jpg)
![bolt-down-step-3-1920_1280[1] slide umbrella over bolt down base pole](https://revolvashade.com/wp-content/uploads/2023/05/bolt-down-step-3-1920_12801-150x150.jpg)
![inground-step-2-1920_1280[1]](https://revolvashade.com/wp-content/uploads/2023/05/inground-step-2-1920_12801-150x150.jpg)
![inground-step-1-1920_1280[1] in-ground base instructions revolvashade](https://revolvashade.com/wp-content/uploads/2023/05/inground-step-1-1920_12801-150x150.jpg)
![inground-step-3-1920_1280[1]](https://revolvashade.com/wp-content/uploads/2023/05/inground-step-3-1920_12801-150x150.jpg)